9% ABV
30 IBU
695 Ratings
This beer is no longer being produced by the brewery.
9% ABV
30 IBU
695 Ratings
This beer is no longer being produced by the brewery.
Henri Bertens is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing at Terrasje Van Henri
Purchased at Bierzar.nl Uw online speciaalbier bazar!
Earned the Baking in Balkan (Level 8) badge!Dave Alberts is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing at Untappd at Home
Nog choco
Earned the наздраве: Breweries from Bulgaria badge!Sascha Wenninger is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing at Untappd at Home
Hints of cold-brew coffee on a somewhat roasty and lightly malty base. Pretty good, but I wish it were a little more solid.
Sergio C is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing at Teddy's Beer
Cherryblossom is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing at Café Willems
Purchased at The Bottle Shop
Earned the Beyond a Shadow of a Stout (Level 13) badge!Johan Willems is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing at Café Willems
Jeroen is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing at Untappd at Home
Purchased at De Bierstudio
Erik Schepers is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing at Untappd at Home
NoaVelner is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing at Untappd at Home
David Macken is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing
John D. is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing at Bierlokaal De Veste
Purchased at Bierlokaal De Veste
Earned the For the Can (Level 61) badge!Kjetil Liland is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing at Preståsen
Purchased at BIER MARKET
Dániel Olcsvári is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing at Untappd at Home
Wouterveurink is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing at Untappd at Home
Greg Varbizky is drinking a Six Months Behind Schedule (2022) by Sofia Electric Brewing at Untappd at Home
Purchased at משקאות מנדלסון חשין
Earned the Beyond a Shadow of a Stout (Level 11) badge! Earned the Baking in Balkan (Level 3) badge!
Purchased at Bierzar.nl Uw online speciaalbier bazar!
Can